Clemson University Bioscience
Location | Clemson, South Carolina |
Architect | Perkins + Will |
Contractor | DPR Construction |
This project, with a six-month duration, called for more than 200 linear feet of our Glenlake stainless steel tube infill railing, as well as 350 feet of our Track Rail glass-supported railing. Grade 316 stainless steel was utilized for all exterior locations, which hold up to environmental exposure to heat, moisture, and airborne pollutants.