• Post supported glass railing attached via top and fascia mount
    Custom post supported glass railing attached via top and fascia mount can be found throughout the newly renovated suite areas at Hard Rock Stadium
  • 16,000 linear feet of ornamental railing within an 8 month time frame
    Engineered, manufactured and installed over 16,000 linear feet of ornamental railing within an 8 month time frame
  • Anodized aluminum railing with frosted interlayer glass infill
    The renovation of Hard Rock Stadium in Miami, FL included over 16,000 lf of ornamental railing including custom anodized aluminum post supported railing with frosted interlayer glass infill.
  • Post supported glass railing in suite areas
    Custom Post supported glass railing in Hard Rock Stadium suite areas with Base Shoe railing in seating area entrances
  • Tensiline cable railing with stainless steel cables and turnbuckles
    This phase of the Hard Rock Stadium renovation added our Tensiline cable railing with stainless steel cables and turnbuckles to field level stairs
  • Large seating platforms
    Large seating platforms in Hard Rock Stadium's Field Club seating areas bring luxury seating areas at both end zones down to field level
  • Post Rail used in luxury seating area as suite diviers
    Custom Post Rail used in “The Nines” luxury seating area as suite dividers
  • Post supported glass railing attached via top and fascia mount
  • 16,000 linear feet of ornamental railing within an 8 month time frame
  • Anodized aluminum railing with frosted interlayer glass infill
  • Post supported glass railing in suite areas
  • Tensiline cable railing with stainless steel cables and turnbuckles
  • Large seating platforms
  • Post Rail used in luxury seating area as suite diviers

Hard Rock Stadium Renovation

Location Miami, Florida
Architect 360 Architecture (Acquired by HOK in 2015)
Contractor Hunt Construction Group

Collaborated with architects and owners to accommodate a fast paced schedule by designing, engineering, manufacturing and installing over 16,000 linear feet of aluminum base shoe, anodized aluminum post supported railing with glass infill and cable railing within an 8 month time frame. Over 2,100 sq. ft. of large forkliftable seating platforms make up four seating sections in the Field Club seating areas bringing luxury seating areas at both end zones down to field level. Portable step, ramp and camera bay infill units were also provided.