• Post supported glass railing attached via top and fascia mount
  • 16,000 linear feet of ornamental railing within an 8 month time frame
  • Anodized aluminum railing with frosted interlayer glass infill
  • Post supported glass railing in suite areas
  • Tensiline cable railing with stainless steel cables and turnbuckles
  • Large seating platforms
  • Post Rail used in luxury seating area as suite diviers

Hard Rock Stadium Renovation

Location Miami, Florida
Architect 360 Architecture (Acquired by HOK in 2015)
Contractor Hunt Construction Group

Collaborated with architects and owners to accommodate a fast paced schedule by designing, engineering, manufacturing and installing over 16,000 linear feet of aluminum base shoe, anodized aluminum post supported railing with glass infill and cable railing within an 8 month time frame. Over 2,100 sq. ft. of large forkliftable seating platforms make up four seating sections in the Field Club seating areas bringing luxury seating areas at both end zones down to field level. Portable step, ramp and camera bay infill units were also provided.